Skip to main content
LAYOUTCALCULATOR SCALE 1/16" CAD
2024 IRC Section R602.3 • SCALE: 1/16" FRACTIONAL
IRC R602 15-1/4" Setback Framing & Carpentry

10-Ft 2x6 Plumbing Wall — 10-Ft Plumbing Wet Wall: 2x6 Studs @ 16" OC Layout

IRC R602.6 bathroom plumbing wet-wall blueprint: 10-ft 2x6 wall at 16" OC (92-5/8" pre-cut studs) sized for 3-inch PVC drain stacks and shower valves.

Calculation notes
Checked against: 2024 IRC Section R602.3
Published by LayoutCalculator. Confirm with your local building official.
REV DATE:
Result summary

Framing a 10-ft wet wall in 2x6 lumber (5-1/2" cavity depth) requires 11 pre-cut 92-5/8" 2x6 studs (+10% cull) and allows boring 3-1/2" holes for 3" DWV drain stacks within IRC 60% bored-hole limits.

Typical Field Application

Bathroom vanity wet walls, tiled shower valve walls, laundry box chases, and kitchen sink vent walls.

Field note

Never run a 3-inch PVC soil stack (3-1/2" OD) inside a 2x4 wall—boring a 3-5/8" hole completely severs a 3-1/2" stud; upgrading to 2x6 framing leaves 2 inches of solid wood.

IRC R602.3 2D SVG Stud Wall Framing & Rough Opening Console
Cut Stud 92-5/8"
Stud Qty 13 pcs
IRC R602 PASS (16" OC)
10 ft (120")
8' (Closet) 16' (Bedroom) 28' (Garage) 60' (Ext)
97-1/8" (8'-1-1/8")
96" (8'-0") 97.125" (8ft Std) 109.125" (9ft) 121.125" (10ft)
✓ PASSES 2024 IRC R602.3 & R602.7 2x6 @ 16" OC

Exact cut stud length is 92-5/8" (Std 92-5/8" Pre-Cut) after deducting 4-1/2" for 3 plates. Offset upper top plate lap joints >= 24" per IRC R602.3.2.

2D IRC R602 Stud Wall Framing Elevation, Rough Openings & Plate Layout Blueprint Interactive scale CAD framing elevation showing PT sole plate, double top plates, common studs on center, king and jack trimmers, headers, cripples, and 3/4-inch hooked-tape setback marks. CUT STUD: 92-5/8" | 2X6 @ 16" OC | ORDER: 13 STUDS (+10%) GOLD: Common (9) • SKY: King (0) • GREEN: Jack/PT (0) • ORANGE: 2x8 Header Wall Length: 10'-0" (120") • 9 Grid + 2 Corner + 0 RO Studs 97-1/8" Cut:92-5/8"
Cut Stud Length
92-5/8"
Std 92-5/8" Pre-Cut
Studs (+10% Waste)
13 Studs
11 Net Framing
16-Ft Plate Boards
3 Boards
30 LF (1 PT Sole)
4x8 OSB Sheathing
3 Sheets
81 Sq Ft Gross
16d Framing Nails
212 Nails
+156 8d Ring-Shank

3/4" Setback Hooked-Tape Plate Marks 16" On-Center

Hook tape at left plate end (0"), scribe each leading stud edge at OC - 3/4", and mark X to the right so 4x8 drywall/OSB seams land dead-center:

Stud Wall Bottom and Top Plate Hooked Tape-Measure Setback Marks
Stud # Leading Edge + X Stud Centerline Framing Role
#1 0" [X] 3/4" Face Start End + Corner Backing
#2 15-1/4" [X] 16" OC 16" OC Grid Stud
#3 31-1/4" [X] 32" OC 16" OC Grid Stud
#4 47-1/4" [X] 48" OC 4-Ft Sheet Seam Stud
#5 63-1/4" [X] 64" OC 16" OC Grid Stud
#6 79-1/4" [X] 80" OC 16" OC Grid Stud
#7 95-1/4" [X] 96" OC 4-Ft Sheet Seam Stud
#8 111-1/4" [X] 112" OC 16" OC Grid Stud
#9 118-1/2" [X] 120" End Closing End Stud

Required Bill of Materials (BOM) & Fasteners

2024 IRC Table R602.3(1)
  • 13 × 2x6 Kiln-Dried Studs (92-5/8" Cut • Std 92-5/8" Pre-Cut) 9 grid + 2 corner backing + 0 king + 0 jack + 10% cull
  • 1 × 16-ft PT Sole Plate + 2 × 16-ft KD Top Plates (2x6) No Headers Required • IRC R317.1 PT sill on concrete + 1/2" anchor bolts @ 6' OC
  • 3 × 4x8 Sheets 7/16" Structural-1 OSB + 212 × 16d Framing Nails Plus 156 × 8d (2-3/8" × 0.113") ring-shank sheathing nails @ 6" panel edges / 12" field

Independent Field Spec Notice: Stud spacing, header bearing jacks, and fastener schedules reference 2024 IRC Section R602.3 and R602.7 with zero manufacturer sponsorship.

Need an ad-free Framing Cut Sheet + Vector .SVG wall elevation?

Pre-Calculated Stud Wall Framing Calculator Blueprints (12 Field Specs)

Select any standard jobsite specification below to load its exact 2D SVG diagram and engineering tables:

Open Base Stud Wall Framing Calculator →
Contractor & Instructor Widget

Embed This 2D SVG Instrument on Your Website (Ad-Free)

Carpentry instructors, trade schools, and builders can embed the standalone ad-free version of this 2D CAD calculator with one HTML snippet.

SPECIFICATION WALKTHROUGH // 10-Ft 2x6 Plumbing Wall

Mathematical Derivation & Field Specifications: 10-Ft 2x6 Plumbing Wall

Updated • Published by LayoutCalculator

Framing a 10-foot (120") 2x6 wall at a 97-1/8" (97.125") total framed height with sole + double top plate (4.5" deduction) establishes an exact vertical stud cut length of 92-5/8" (92.625").

At 16" on-center spacing, the wall requires 8 grid layout studs plus California 3-stud corner backing and rough-opening king/jack framing (10 net studs; order 11 studs with 10% cull), 2 × 16-ft plates, and 3 sheets of 4×8 OSB sheathing.

On-Center Stud Spacing Comparison for 10-Ft 2x6 Wall

OC Spacing Grid Studs Order (+10% Cull) 1st Tape Setback 2024 IRC R602.3 Rating
12" OC 11 15 Studs 11-1/4" X IRC 2x4 & 2x6 Multi-Story
16" OC (Selected) 8 11 Studs 15-1/4" X IRC 2x4 & 2x6 Multi-Story
19.2" OC 7 10 Studs 18-7/16" X Verify Roof-Only / Engineered
24" OC 6 9 Studs 23-1/4" X IRC R602.3 OVE 2x6 Pass

3/4" Setback Hooked-Tape Plate Layout Marks (16" OC Sheet-Centering)

Stud # Leading Edge (Scribe + X) Stud Centerline 4×8 Panel Alignment
Stud #2 15-1/4" [X] 16" Field Stud
Stud #3 31-1/4" [X] 32" Field Stud
Stud #4 47-1/4" [X] 48" 48" Sheet Seam
Stud #5 63-1/4" [X] 64" Field Stud
Stud #6 79-1/4" [X] 80" Field Stud
Stud #7 95-1/4" [X] 96" 48" Sheet Seam
Stud #8 111-1/4" [X] 112" Field Stud

Official Building Code & Industry Standard Citations

  • ICC International Residential Code (IRC R602.3) Wood stud wall framing: stud size, height and spacing limits, top-plate splices, and header requirements. Reference: ICC Digital Codes (codes.iccsafe.org).
  • APA Engineered Wood & AWC NDS Span Standards Governs structural panel thickness, kerf tolerance, and Southern Pine / Douglas Fir stringer throat bending capacity. Reference: APA Engineered Wood Association (apawood.org).

Field Manuals & Code Tables for Stud Wall Framing Calculator

Index of All 107 Manuals →

Frequently Asked Questions (10-Ft 2x6 Plumbing Wall)

What is the exact stud cut length and total stud count for a 10-ft × 97-1/8" 2x6 wall at 16" OC?

▼

Deducting 4.5" (sole + double top plate) from the 97-1/8" framed wall height yields an exact stud cut length of 92-5/8". Across 10 ft at 16" OC (10 net studs w/ corners & openings), order 11 2x6 studs (+10% cull) and 2 × 16-ft plates.

Where do I place my first tape-measure mark so 4x8 sheathing lands on stud centers at 16" OC?

▼

Hook your tape at 0" on the flush outside edge of the end stud and mark the leading edge 3/4" back of 16" at 15-1/4" with an X to the right, then 31-1/4" and 47-1/4" so every 48-inch OSB and drywall edge lands dead-center on a 1-1/2" stud.

How many 4x8 OSB sheathing panels are needed for this 10-ft wall?

▼

Covering a 10-ft × 8.1-ft wall surface (81 sq.ft gross) requires 3 sheets of 4x8 structural rated sheathing (7/16" or 15/32" Exposure 1 OSB) with an 8% trim buffer.